Prefabricated Galvanized Steel Structure Engineer Building Poultry Farm Chicken House

Light steel structure workshop is a new type of building structure system, which is formed by the main steel framework linking up H section, Z section and U section steel components, roof and walls using a variety of panels and other components such as windows, doors, cranes, etc.

Steel SurfaceGalvanize or Painted
Steel GradeQ345 or Q235
Steel FrameWelded H Section Steel
Insolation MaterialSteel Sheet +Rock Wool
SizeCustomized

Steel structure
Primary frame element such as steel columns, steel beams and other members are made by hot-galvanized hot-rolled H section steels and welded section steel, which will be bolted together at site. A factory galvanization surface treatment is applied to get better anti-rusting and anticorrosion effect of primary framing elements.
Secondary Framing- Galvanized purlin, tie bar, roof and wall support, are formed as secondary framing.
Bracing- Round steel is supplied with knee bracing and other supporting parts that need portal framing, which will improve the stability and durability of the whole structural building.

Cladding
Roof and Wall are covering of color-coated corrugated steel sheet, hot dipped with zinc and aluminum compound, which is fixed to the outside of structural building to protect it against bad weather or to have a good appearance.

Our main scope:
1. Steel Construct Multi & super high rise building(CBD Building).
2.  Steel Construct Public buildings
3. Steel Construct Bridge
4. Steel Construct Workshop, Wareshouse, Farm Buildings.
5. Steel Construct Residential Living Community.
6. Steel Construct Airport, Train Station.

bwgj

FAQ
1)Is your company a factory or trade company?
We are factory, so you can get the best and competitive price.
2)What’s the quality assurance you provided and how do you control quality ?
Self inspect every steps during the design and fabricate, the third inspect party aslo be accept.
3) Do you offer guiding installation on site overseas for warehouse building?
Yes, We can send our professional technical engineer to supervise installation on site overseas. They have succeeded in many countries, such as Iraq, Dubai, South Africa, Algeria, and Ghana.
4) What is your main market?
Europe, Africa, Middle east asia, south east asia, Australia, New Zealand, south America etc

5) How about the delivery time?
About 30days after receiving deposit.It’s depend on the projects’ and your requirement,too.

zx3

Take the next step

We have a passion for unconventional solutions that bring your vision to life.

Related Projects

Pre-Fabricated Steel Manufacturing Facility

Read More

Pre-favricated Steel Frame Data Center

Read More

Battery Manufacturing Steel Structure Plant

Read More
滚动至顶部